PC 50 Two-Stage Wellsite Gas Compressor
High-versatility two-stage gas compressor engineered to handle wide pressure differentials, fluctuating gas volumes, and demanding gas lift requirements.
Mastering Variable Wellhead Pressure
In modern unconventional fields, wellhead conditions are rarely static. Pressure and volume fluctuate significantly throughout the day based on artificial lift cycles, line pressure swings, and fluid production surge
reduced casing pressures, three-stage compression are often underutilized and over horsepower, which can result in overinjection as well as excess fuel burn resulting in lost production.
The PC50 is explicitly engineered to solve this challenge. By optimizing compression ratios, managing injection rate, and utilizing on skid programming for your application, the PC50 allows optimal and efficient wellhead operation. Powered by a 50 HP EPA-certified 4.3L natural gas engine, this unit is the ultimate flexible workhorse for active oil and gas fields.
PC 50 Fuel Cost Comparison
The Precision Compression PC 50 can save operators tens of thousands of dollars a year in fuel costs while increasing well performance.
3304NA
$36
Average Daily Cost
18 MCF
Average Fuel Consumed
$1,350
Cost Per Month
$16,425
Cost Per Year
3306TA
$80
Average Daily Cost
40 MCF
Average Fuel Consumed
$2,400
Cost Per Month
$29,200
Cost Per Year
PC 50
Uses up to 75% Less Fuel*
$20
Average Daily Cost
10 MCF
Average Fuel Consumed
$600
Cost Per Month
$7,300
Cost Per Year
* Fuel comparison based on a 24-hour comparison between 3304NA, 3306TA unit and Precision Compression PC50 2-stage 50hp unit running similar capacities.
Technical Specifications & Features

PC 50 (Two Stage Compressor)
Engine Model: 4.3L Industrial Natural Gas Engine
Horsepower Rating: 46 HP
Emissions: EPA Certified
Compression Stage: Two-Stage Reciprocating Compressor
Control System: Integrated Precise Sync™ technology with Murphy Control Panel
Data Logging: Real-time Telemetry & Cloud Analytics

Key Applications for the PC 50
01.
PAGL / GAPL Applications
Delivering optimal injection rates to fine-tune well performance.
02.
Continuous Gas Lift
Pulls casing pressure down to vacuum levels while boosting gas up to high sales line pressures (e.g., boosting from 10 PSI to 300+ PSI)
03.
Casing Drawdown
Pulls down casing pressures on wellhead, ESP, or other similar applications to reduce down-hole pressure, stimulate inflow, or reduce gas interference.
04.
Sales / Booster
Serves as a localized booster unit to push gas through restrictive gathering laterals.
Engineered for Maxium Field Uptime
Interstage Temperature Control
Dual-stage cooling prevents thermal breakdown of lubricating oils, extending valve and packing seal life.
Vibration Isolation
Easily squeezes onto crowded multi-well pads without obstructing tanker trucks or routine well maintenance.
Precise Sync™ Integration
Automatically recalibrates engine speed and suction control valve positions during gas surges to maintain continuous run-time.
Backed by Regional Service Hubs
When you deploy a PC 50 skid, you gain access to our dedicated field service network. Located strategically throughout Texas, New Mexico, Oklahoma, and Wyoming, our technicians carry standardized PC 50 replacement parts in their trucks, ensuring rapid response times if service is ever required.
